Menu

Case Studies: Workshop Buildings

Increases in demand or rationalising processes can stretch available operational space. A temporary building can provide additional workshop or production space in a matter of weeks, for the exact period required. Insulated cladding options can ensure a temperature controlled environment for workers.

New workshop building for vehicle maintenance

Wiltshire Concrete, based in Devises, Wiltshire prides itself on providing a one stop shop for its customers, a similar concept to the over-arching service Aganto can often provide to their own customers. The Wiltshire Concrete ready-mixed concrete facility offers a delivery service, with a fleet of 20 6m3, 7m3 and 8m3 truck mixers. The company … Read more

Temporary workshop mixes with the sailing elite

  Background Based at Camber Dock in Old Portsmouth, Ken Brown Boats provides dry stack services, brokerage and container storage. Temporary workshop requirement Camber Docks’ appeal led to Sir Ben Ainslie choosing the site as headquarters for the America Cup Challenge. A wonderful coup for the Dock but one that meant KB-Boatpark Dry-Stack had to … Read more

Temporary workshop facilitates new contract

  Background to the temporary workshop project Founded in 1979 Scarab is a leading global manufacturer and supplier of road sweepers. Their vast range of sweepers all share the same superior build, performance and low environmental impact and come with an after sales service that ensures this high performance level and superior quality is maintained. … Read more

Temporary boat workshop hire

Established in 1968, Piper boats is a family run business specialising in the design and build of fine steel boats for the leisure and residential markets Requirement for increased workshop space With demand for the Wide beam boats increasing the company needed more space to cope with the extra orders as well as the larger … Read more

Modular building creates production line facility

Due to increased growth, leading butter manufacturers, The Kerrygold Company, were undergoing a major redevelopment at their factory in Staffordshire. Their packing store had been demolished to make way for a new facility, and during this time the production line had to be moved into a temporary building. Insulated modular building Aganto provided the instant … Read more

Operational space for manufacturing

  New operational space for manufacturing company World class manufacturing innovators, Formaplex, are experiencing such a level of rapid growth and expansion, that they turned to Aganto to increase their internal operational and storage space. Formaplex and Aganto: A match made in manufacturing heaven Hampshire-based Formaplex Group are a preferred supplier for the design and … Read more